Concrete Calculator: Volume, Cement Bags, Sand and Aggregate
Enter the length, width and thickness of the slab or member, choose a nominal mix and the wastage. The calculator gives the concrete volume and the cement, sand and aggregate to order.
Estimates only. Check important results before you rely on them.
More Construction calculators
View all 10You may also need
From related categoriesHow to use this calculator
- Choose feet or metres and enter the length and width.
- Enter the thickness in millimetres.
- Pick the mix. M20 (1:1.5:3) is common for slabs and beams.
- Read the volume, cement bags, sand and aggregate.
The formula
Worked example
A 12 ft × 10 ft slab, 150 mm thick, with 5% wastage and an M20 mix (1:1.5:3): volume 1.672 m³, with wastage 1.756 m³ (62 cft). Dry volume 2.704 m³ gives about 14.2 bags of cement, 0.74 m³ of sand and 1.47 m³ of aggregate.
Understanding your result
The factor 1.54 allows for the extra material that is needed to make 1 m³ of compacted concrete, because the dry materials shrink in volume when mixed with water. The chart shows the cement, sand and aggregate share by volume.
When to use it
- Estimate material for a slab, footing, plinth or column.
- Compare the cost of different mixes.
- Plan deliveries so that site storage is not overloaded.
Assumptions and limits
These are planning estimates. Real use depends on material quality, site conditions and workmanship. Confirm quantities with your engineer or contractor before ordering. Mixes are nominal volume-batch ratios. For structural members, follow the mix design from your structural engineer.
Frequently asked questions
How do I calculate the volume of concrete?
Multiply length, width and thickness, all in metres. A 12 ft × 10 ft slab 150 mm thick is about 1.67 m³.
How many bags of cement are needed for 1 m³ of M20 concrete?
About 8 bags of 50 kg, including a small wastage allowance.
Why multiply by 1.54?
Dry materials lose volume when mixed and compacted, so about 54% extra dry volume is needed to make 1 m³ of concrete.
What wastage should I allow?
5% is common. Use more for uneven ground, difficult access or pumped concrete.
What does M20 mean?
The characteristic compressive strength is 20 N/mm² after 28 days. The nominal mix 1:1.5:3 is cement : sand : aggregate.